Construction time:2008 Completion time:2009 Project area:35,858㎡ Volume of steel:50,000t
Project description: The landmark building in Tianjin. The structure components adopted in this project are circular pipe(2011x25mm), box column, welded H-section steel beam, hollow section steel and 30mm steel plate shear wall. The thickest plate is 90mm, and the total steel weight is 50,000t.