国产性夜夜春夜夜爽18亚洲精品黄色_黄页毛片一区二区国产_国产在线观看丝袜美腿_国产偷国产偷亚洲高_欧美日韩亚洲tv不卡久久_h成人动漫在线观看_亚洲国产高清欧美在线成人_欧美日韩一中文字幕_一级毛片高清免费网站_成年1314在线观看

JINGGONG TECHNOLOGY

TECHNOLOGY

>

專(zhuān)有技術(shù)

Bending and Twisting Technology

發(fā)布時(shí)間:2018-06-08

閱讀:4730


The technology is mainly applied to complex variable and exposed structure of large projects, a solution to the fabrication of space box type structural elements under flexure and torsion. The development of this technology is a revolutionary reform against the traditional roasting and top-pressing fabrication processes, has remarkably increased the fabrication precision and efficiency.

2008 Beijing Olympic main stadium – Bird’s Nest, its structure is very complex. Nearly 30 technical problems need to be solved to hold up this behemoth of 48000 tons. How to design, produce and install over 3000 large bending and twisting steel members is a big challenge. JINGGONG conquered it with the technology of digital controlled machine for bending and twisting steel plates. From then on, the technology has been applied for Shenzhen Bay Sports Center, Dongying Snow Lotus Theater, Arches in King Fahad Financial Plaza, Makkah High Speed Railway Station, etc.


國(guó)家體育場(chǎng)(鳥(niǎo)巢).jpg

National Stadium - Bird's Nest, Beijing, China


1516166736926793.jpg

Shenzhen Bay Sports Center, China


timg.jpg

Dongying Snow Lotus Theater, Shandong, China


6-沙特麥加火車(chē)站效果圖.jpg

Makkah High Speed Railway Station, Saudi Arabia